SC Alert: SC firmware was reloaded
sc> resetsc *****重起SC使更新的固件生效*****
Are you sure you want to reset the SC [y/n]? y
User Requested SC Shutdown
ALOM BOOTMON v1.2.5
ALOM Build Release: 000
Reset register: 00000000
ALOM POST 1.0
Dual Port Memory Test, PASSED.
TTY External - Internal Loopback Test
TTY External - Internal Loopback Test, PASSED.
TTYC - Internal Loopback Test
TTYC - Internal Loopback Test, PASSED.
TTYD - Internal Loopback Test
TTYD - Internal Loopback Test, PASSED.
Memory Data Lines Test
Memory Data Lines Test, PASSED.
Memory Address Lines Test
Slide address bits to test open address lines
Test for shorted address lines
Memory Address Lines Test, PASSED.
Boot Sector FLASH CRC Test
Boot Sector FLASH CRC Test, PASSED.
Return to Boot Monitor for Handshake
ALOM POST 1.0
Status = 00007fff
Returned from Boot Monitor and Handshake
Loading the runtime image... VxWorks running.
Starting Advanced Lights Out Manager CMT v1.2.6
Copyright 2006 Sun Microsystems, Inc. All rights reserved.
Use is subject to license terms.
Current mode: NORMAL
Attaching network interface lo0... done.
Attaching network interface motfec0.... done.
Booting from Segment 0
SC Alert: SC System booted.
Sun(tm) Advanced Lights Out Manager CMT v1.2.6
Full VxDiag Tests
BASIC TOD TEST
Read the TOD Clock: FRI NOV 17 11:52:33 2006
Wait, 1 - 3 seconds
Read the TOD Clock: FRI NOV 17 11:52:35 2006
BASIC TOD TEST, PASSED
ETHERNET CPU LOOPBACK TEST
| 论坛热门帖子: | [lch203] 写得蛮好的linux学习笔记(10-21) [黑马制造] 学习java的30个目标(10-19) [笑傲股林] 做测试半年了,有点迷茫,应该再学些什么提高自己的测试水平和测试能力呢?(10-19) [udp8589] 大家用google的来吱一声? 用百度的~~也来报道下?(10-18) [沂偌掳兆] 本人总结的一些认为C++比较经典的书籍,希望对大家有用(10-18) |
| TAG标签: | 步骤 升级 .......... PASSED. 回复 sc 支持 安装 注意 |
注册
个人空间
